Skip to content
Omnia Pools
Pool quotation
swimming pool construction Nepalpool construction processMagiline pools NepalMagipool Panel

Swimming pool construction process in Nepal

Follow Omnia Pools through the swimming pool construction process in Nepal, from groundwork and Magipool Panel assembly to the finished pool.

By Omnia Pools team3 min read

Updated

Pool construction stage 6: the completed swimming pool and adjoining round pool filled with water, beside a paved deck and marigolds.

Magiline technology with Magipool Panel

A pool starts with a plan for the site, its intended use, layout, depth and budget. The structure, circulation system, lighting and surrounding deck are planned together before work begins.

The pool shown here uses Magiline technology with Magipool Panel. These modular polypropylene panels act as permanent formwork: they are assembled to define the pool walls and remain in place as concrete is cast around the reinforcement. The result is a reinforced-concrete pool structure.

The photographs follow one Omnia build from groundwork to filling. Notice how the skimmer and pipe are positioned before concrete, then how the steps, coping and drainage come together before water is added. Learn more about Magiline’s modular structure.

01 · Groundwork and base preparation

The pool area is excavated and the base is prepared to the planned shape and levels. These photographs show workers laying brick bedding and spreading concrete to create a working base for the next stage.

Pool construction stage 1: workers preparing brick bedding inside the excavated pool area.
Pool construction stage 1: concrete being spread over brick bedding to prepare the pool base.

02 · Assembling Magipool Panel walls

Magipool Panel units are arranged on the prepared base and assembled around the pool perimeter. The panels establish the pool outline, provide permanent formwork for the concrete walls and accommodate the planned wall fittings.

Pool construction stage 2: modular wall panels laid out on the prepared base before assembly.

03 · Installing fittings and pipe connections

Skimmers and other wall fittings are positioned as the walls take shape. Their positions need to agree with the planned circulation layout.

Pool construction stage 3: a skimmer body and connecting pipe fitted into the pool wall panels.

The skimmer body and connecting pipe are visible inside the wall panels while access remains open for the following construction stages.

04 · Reinforcement and concrete work

Steel reinforcement is placed across the pool floor, and the Magipool Panel walls are braced for concrete placement. These photographs show the reinforced floor and concrete being placed into the wall panels. The panels remain in place as part of the construction system.

Pool construction stage 4: steel reinforcement across the pool floor with wall panels and fittings in position.
Pool construction stage 4: workers placing concrete into braced pool wall panels beside the reinforced floor.

05 · Interior finish, coping and deck

The pool interior is finished, with the entry steps, edge coping and surrounding deck brought together.

Pool construction stage 5: the empty pool with a blue interior finish, entry steps, coping and deck drainage.

Before filling, the entry steps, blue interior, coping and deck drainage can be seen together.

06 · Filling, checks and the finished pool

The pool is filled so the water system and installed equipment can be checked before handover. The final photograph shows the completed main pool and adjoining round pool, with the finished deck and landscaping.

Pool construction stage 6: the completed swimming pool and adjoining round pool filled with water, beside a paved deck and marigolds.

Plan your pool and equipment

Bring your proposed dimensions and site photographs to discuss the next build. Explore Omnia’s completed projects and use the pool quotation tool for an initial budget. You can also browse pumps, filters and underwater lights while planning the water system.